伊在线久久丫 I 日韩三极 I 99热com I 在线看中文字幕 I 97视频一区二区三区 I 韩国美女被c I 久久精品漫画 I 综合色爱 I 91成人黄 I 午夜精品蜜臀一区二区三区免费 I 操外国老女人视频 I 精品无人乱码高清在线观看 I 日韩欧美在线综合网另类 I 日本xxxx公交车少妇 I 一寸一寸挤进刘亦菲体内 I 欧美人与动欧交视频 I 国产一区二区三区四区视频 I 少妇一级淫免费观看 I 欧美扩阴视频 I 北条麻妃视频在线观看 I 久色成人网 I 无码人妻久久一区二区三区免费丨 I 国产大奶 I 99久久国产成人精品 I 蜜臀av在线免费观看 I 九九在线观看精彩视频 I 成年人免费在线观看视频网站 I 制服丝袜亚洲色图 I 九九热免费精品视频 I 成人123 I 中文免费av I 手伸进胸罩里摸她乳尖 I 极品人妻一区二区三区 I 国产精品99久久免费观看 I 国产破处视频 I 中文字幕成人在线观看 I 久久不见久久见www免费视频 I 日本公妇乱淫 I 亚洲在线看 I 亚洲蜜桃妇女 I 四虎新域名 I 啊灬啊别停灬啊灬快点最新连载 I 欧美激情不卡 I 国产1区2区3区精品美女 I 8x8x网 I 在线激情视频 I 欧美久久久久久久 I 中出精品 I 欧美亚洲一区二区在线 I 亚洲黄网站在线观看 I 影音先锋在线网站 I 日韩特黄毛片 I 秋霞7777鲁丝伊人久久影院 I 色先锋av电影 I 91成人看片片 I 青青青国产精品国产精品美女 I 福利一区二区在线观看

SPORTS INFORMATION

硅pu球場

Foundation construction steps of water-based terrace

專賣工廠:硅pu球場廠家作者:健倫硅pu球場發布時間:2023-04-30 00:28:16

大多數乒乓球業余選手易犯的錯誤動作匯總

打乒乓球時要注意禁忌那些動作?

乒乓球業余選手集中發力需要注意的問題

乒乓套膠各品類價格與銷量分析

乒乓膠皮的那些事:怎樣保養方法更好

平野美宇與馮天薇成女乒模擬對抗訓練目標

乒乓球如何從訓練的從容道比賽的自如

乒乓球技術提高之放松握拍

乒乓套膠怎樣保養最好?

健倫乒乓球臺球桌的保修與部件更換

健倫體育教您如何保養乒乓球臺(球桌)?

健倫乒乓球臺(球桌)怎么樣,球臺有什么特點?

乒乓球套膠粘性膠皮與澀性膠皮的區別及保養

乒乓球底板各種材質與性能特點

你知道反拉在實際比賽中的應用嗎?

健倫乒乓球運動地板工程

如何預防乒乓球底板拉絲

乒乓球比賽有哪些方法?

乒乓球底板層數結構

日式乒乓球底板性能介紹

Foundation construction steps of water-based terrace

1. Base treatment

Clean the ground, remove the cement pimples and loose shelling; clean the dust and particles in the construction joints, cut the irregular cracks into V-shaped joints, and level them with epoxy mortar. Make the foundation flat and solid, and then use a professional dust-free grinder to polish and vacuum;

2. Apply epoxy sealing primer

Objective: to penetrate concrete base, ensure the combination with concrete, and improve the adhesion of concrete base.

Construction requirements: thin and even without omission

Construction method: after the ground is polished and cleaned, directly brush the undercoat on the ground. Before construction, calculate the amount of materials to be used and evenly coat. Pay attention to the balance between the construction progress and the materials to be used when batching. Do not open too much materials at one time to ensure that the materials still meet the available time when painting. Brush them before gelatinization to keep good permeability and bonding performance. The purpose of bottom coating is to close the base surface and enhance the adhesion. Generally, it should be cured for more than 12h. After confirming the curing, the next process can be carried out.

3. Construction of middle coat mortar layer (the thickness and flatness of mortar layer can be increased)

Objective: to improve the smoothness and wear resistance of epoxy floor.

Construction method: mix the Guanglei intermediate coating material according to the correct proportion, then slowly add quartz sand, mix evenly, first make up the low concave defects on the base surface; then use a scraper to evenly coat the epoxy intermediate coating material on the ground, and then polish and dust after it is fully cured. After cleaning, the next process can be carried out.

4. Apply epoxy putty layer

After mixing the Guanglei intermediate coating material or surface coating material according to the correct proportion, slowly add quartz powder or talcum powder, and use epoxy putty (fine powder, thinner, better leveling) to level the base surface with leveling method. The purpose is to adjust the flatness and fineness of the base surface. After confirming the curing, the next process can be carried out.

5. Roll coating

Objective: to improve the impermeability and wear resistance of epoxy floor, and to obtain a bright color surface.

Construction method: after curing, the epoxy putty shall be polished, polished, cleaned and vacuumed. After mixing the surface coating materials in the correct proportion, the scraper shall be used to scrape and paint once first. After curing, the defects shall be repaired and then the roller shall be used to roll paint for the second time to cover the roller traces left during the first roll coating of epoxy paint and make the color paint more uniform.

Environmental requirements for coating construction: the construction base surface shall be kept clean, and there shall be no cross operation of other engineering construction.

6, conservation

After finishing the surface coating, the relevant construction materials and tools shall be removed from the site, and the finish shall be tightly sealed and protected. At least 24 hours later, people are allowed to walk. It is not allowed to bring in sediment. Generally, it takes

7 days for the paint film to fully solidify. During this period, other engineering construction, transportation, installation and other construction shall be avoided.

主站蜘蛛池模板: 昭通市| 蒙城县| 马山县| 张家口市| 和平区| 双江| 始兴县| 墨江| 牡丹江市| 和政县| 平阳县| 昭通市| 黄骅市| 无为县| 浙江省| 安达市| 蚌埠市| 龙江县| 太仆寺旗| 石狮市| 荣成市| 嘉祥县| 襄樊市| 陆丰市| 沂南县| 兴化市| 巴楚县| 聂拉木县| 浦江县| 库车县| 乐至县| 扶余县| 南木林县| 汝阳县| 湟源县| 大兴区| 天长市| 阜南县| 北安市| 壶关县| 临汾市|